One of the major factors leading to a successful project is the careful coordination of details of the electro-mechanical installation with architectural, structural requirements. Crown Home prides itself on its frequent coordination sessions – made all the more easy as the related departments are integrated to the consultancy.
To complete a project successfully, Crown Home undertakes five major steps:
- Carrying out a field investigation to assess local conditions and to determine the local availability of equipment, material and organizations for service and maintenance.
- Preparation of a preliminary report , to include estimates of basic requirements and the choice of systems concepts.
- Preparation of a Fundamental Design, including economic comparison of alternatives, description of selected systems, sizing of major components, outline specification and budget estimates.
- Preparation of a Final Designs and Tender Documents including construction drawings, technical specifications, bill of quantities and cost estimates then, subsequently, Tender Evaluations.
- During construction the Project team remains responsible for the approval of the contractor’s shop drawings, equipment selection, and general follow- up on the construction site until commissioning and handling over.
|